Friday, December 19, 2014

how to maintenance pool after treatment

To fulfill the quality standards that clean and healthy water ready to use the water in the swimming pool and the previous process through the process that has been specified above, then we will teach to you how to stabilize the water so easily damaged tidah water or often dirty

As for how to treat them regularly or routines can use the dosing pump system with a particular timer calculation or a simple manner, for example, we discuss the simplest way is as follows:
The first step is given ¼ Drugs alone in the pool every 3 days earlier in the clear water pool with a way in vaccum dirt through the filter or vacuum mobile

If you want normal vaccum, maindrain turn off the valve, the valve balancing tanks (over flow system shut down and open the drain valve vacuum fittings for over flow or skimmer system so dirt above will overflow then dirt under vacuum deposition can be reached by mobile.

First test water pH and chlorine content of the water pool In using test kits, whether PH, CL less or not

If the water content PH / Chlorine in a stable state then our next step is to add chlorine to the water to remain stable in the span of three days, the next step is to add chlorine 90% 2 Clasp hands of adults (for standard size approximately 40m3 of water volume) and trussi 1 handful thawed) by means of alternating.

You can also add as much as 90% Clhorine 3BJ tablet into the water pool or into the balancing tank, so that dirt on clhorine and remain binding clhorine content besides clhorine also not easy ambles into the water benthic,

Next is the turn on the machine circulation min 6 hours / day on the condition that handle filter in the filter position

And for the next 3 days of treatment do the same so that the concentration of water in a stable state

No comments:

Post a Comment